About us     Products    Download       News    Certificates    Contact us
 Products
KTLDE Electromagnetic Flowmeter
KTLU Vortex Flowmeter
KVCF V-cone Flowmeter
KVAF Metal Variable Area Flowmeter
 
 KTLU Vortex Flowmeter
Technical Features
Working Principle
Circuit Diagram
How to Select Meter Model Correctly
For Mass Flowrate of Saturated Steam
For Mass Flowrate of Superheated Steam
For Gas Volumetric Flowrate under Operating Condition
For Gas Volumetric Flowrate under Standard Condition
For Volumetric Flowrate of Liquid
Structure of Vortex Flowmeter
How to Select Right Installing Site
Installation in Pipe with Insulating Layer
Change Direction of Amplifier Box
Wiring for Meter with Frequency Output Signal
Wiring for Meter with Two Wires 4-20mA Output Signal
Wiring for RS-485 Communication
How to Select Pressure and Temperature Measuring Point
Preparation before Operation
Model Selection
Meter Specification
Dimension of Meter Outline
Dimension for Fixed Inserted Vortex Flowmeter & Installation
Dimension of Adjustable Inserted Meter & Installation (with Ball Valve)
Installation of Pressure Transmitter & Thermal Resistor Pt100
Production Standards
Precaution for Selection and Usage of Explosion Proof Vortex Flowmeter
KTLU Vortex Flowmeter
 
 Dimension for Adjustable Inserted Vortex Flowmeter &Installation (with Ball Valve)
 
Parts    
1. Hand handle 2. Converter 3. Guide rod
4. Scale 5. Screw rod 6. Enclosure
7. Seat for inserted rod 8. Ball valve 9. Inserted rod
10. Transducer    

Installation Procedures:
1. Drill a hole in the customer's pipe by method of torch cutting, with diameter slightly less than Φ100, no burr at the edges of the hole to make the measuring probe inserted through it freely.
2. Weld a matched short-duct (supplied by Kent) on the hole on the pipe by spot welding, the axes line of the short-duct is perpendicular 90o to the one of the pipe, as well as its extending line is through the circle center of cross-section of the pipe, then welding all-around.
For adjustable type
3. First install ball-valve (Q41F-16R-32R, ID100mm, supplied by customer), then install converter on the valve.
4. The inserted deep is 0.5D, measuring the length of the short duct and ball valve, adjusting screw rod to make the inserted deep is conformed with the specification.
5. Check all if it is good, open valve slowly and check the leakage (care of personnel safety).


Caution:
1. Flow direction must be conformed with the flow arrow on the meter body;
2. When weld the flange and pipe, the converter should not be installed on the pipe to avoid any damage of the converter.
 

Copyright ©2004-2008 SHANGHAI KENT INTELLIGENCE METER CO., LTD.